Bowers Renovation
August 2013

Previous Home Next

C13

August 16, 2013.
A view south from the landing between the second and third floors in the "Animal head" stairwell.
At about eye level is the third floor connection between Bowers I and II, and below is
the second floor connection.  A wall of glass (partially seen from the outside
in the second August photo) will extend from the first floor to the third.