August 16, 2013.
On the Third Floor in one of the Biology research labs designed with both
the lab and adjacent
office with windows to the outside. Here in the lab, with Joe Inman,
the casework has been
largely installed and next will be the countertops. The next picture
shows a view in the opposite direction.