Bowers Renovation |
August 16, 2013.
This is the BIO 202 lab in the new addition. Because this lab and the BIO 201 lab
are outside the footprint
of the old wing they are a little larger than the labs in
the renovated wing itself. Again plumbing can be seen coming through
the epoxy flooring, and above the grid work for the dropped ceiling.
Return to Renovation Photo Gallery List