Bowers Renovation |
January 11, 2013.
View from Sperry of the planetarium steel going up on the southeast corner
of the lobby.
The openings on the left and right will be the south and east entrances to
the lobby.
To the left, the supports and forms for the floor of the third floor of the
addition are being assembled.
Return to Renovation Photo Gallery List