Bowers Renovation
January 2013

Previous Home Next

C08

January 11, 2013.
More steel is added to the slanting walls of the planetarium.  To the right, the opening
 will be the east entrance to the lobby and through the planetarium, above the blue dumpster,
can be seen the curved opening for the south entrance to the lobby.

Return to Renovation Photo Gallery List