Bowers Renovation
September 18, 2013

Previous Home Next

C38

September 18, 2013.
The windows in the connection corridor between the two wings
have been installed with the brickwork below.  The finishing touches
to seal the two groups of windows is in progress.

Return to Renovation Photo Gallery List