Bowers Renovation
September 2013

Previous Home Next

C32

September 16, 2013.
The front of the Microbiology Lab.  The Instructor's bench is to the right and the student benches
can be seen with sinks.  Holes for plumbing fixtures are drilled once the countertops are in place.

Return to Renovation Photo Gallery List