Bowers Renovation
September 2013

Previous Home Next

C23

September 16, 2013.
The Medium Classroom.  You can see part of the double door entrance at the right and, out of the picture
to the right, is the front of the room.  The entrance is off the museum near the main corridor.
An odd feature, due to the placement of a column, is the structure to the rear with some
space behind it, possibly useful for storage.

Return to Renovation Photo Gallery List