November 28, 2012. The new large
lecture hall is being filled with gravel where the excavator is. The
rear of the lecture hall
is behind the excavator where the rear 3 tiers of seating are already formed
in concrete.
To the left are foundation walls and more of the gravel base for the new
connection to Bowers II.