Bowers Renovation
November 2012
November 9, 2012.
East end of the Third Floor looking at Old Main.
The stairwell has been filled in and the drafty old windows removed
for the connection to a new stairwell on the exterior of the building.
Return to Renovation Photo Gallery
List