Bowers Renovation
November 2013

Previous Home Next

C12

November 14, 2013.
Looking through the Museum area (dark floor) and the Lobby (white floor) out the south
entrance to the building.  The dark flooring is being prepared for laying a terrazzo floor.
This process is further along in the Lobby area.  A stairwell down to the Ground Floor
can be seen behind the wooden railing at the right.

Return to Renovation Photo Gallery List