Bowers Renovation |
May 13, 2013.
A look into the two-story basement. Air handling equipment for the
Planetarium and large lecture hall
can be seen on the extreme upper right, with duct work along the ceiling.
Down below are some of
the pumps and piping that fill the space.
Return to Renovation Photo Gallery List