Bowers Renovation |
May 13, 2013.
A view from the rear of the large lecture hall down along where the tiered
seating will be
to the front of the room. The studs enclose a prep room behind the
lecture hall and
an emergency exit can be seen to the outside on the right.
Return to Renovation Photo Gallery List