Bowers Renovation
March 2013

Previous Home Next

C19

March 18, 2013.
View from the south.  From the large square column in the middle of the photo to the left,
 is where the large lecture hall will be.  The entrance doors to the lobby will be to either
side of the column to the right.  The open space under the angled roof at the top will be the two
General Chemistry labs.  The wooden structure between the barrels will be where the
removable concrete lid will be.  It will provide "easy" access (under the lawn) to the basement
whenever a large boiler or other equipment needs to be replaced.
(Photo credit: Multivista)