Bowers Renovation
June 2013

Previous Home Next

C19

June 7, 2013.
Third Floor General Chemistry labs.  The sheetrock between the two rooms has not been installed yet.
A great deal of ductwork can be seen on the ceiling for the exhaust hoods, one of which is at the lower left.

Return to Renovation Photo Gallery List