Bowers Renovation
June 2013
June 7, 2013.
Third Floor General Chemistry labs. The sheetrock between the two rooms has not been installed yet.
A great deal of ductwork can be seen on the ceiling for the exhaust hoods, one of which is at the lower left.
Return to Renovation Photo Gallery
List