June 7, 2013.
This is in the new addition looking from the BIO 201 lab through to the
adjoining BIO 202 lab.
Installation of the sheetrock has happened later in the addition. The
outside wall, looking south, is about
chest high with windows above that. Bowers II can be seen to the
southwest.