Bowers Renovation
June 2013

Previous Home Next

C14

June 7, 2013.
This is in the new addition looking from the BIO 201 lab through to the adjoining BIO 202 lab.
Installation of the sheetrock has happened later in the addition.  The outside wall, looking south, is about
chest high with windows above that.  Bowers II can be seen to the  southwest.

Return to Renovation Photo Gallery List