Bowers Renovation
June 2013

Previous Home Next

C10

June 7, 2013.
Inside the lecture hall.  The studs in the back will support a wall that separates this room from a prep room.
The opening to the outside will be an emergency exit and connects to the ramp in the previous photo. 

Return to Renovation Photo Gallery List