Bowers Renovation
July 2013

Previous Home Next

C19

July 18, 2013.
Third Floor General Chemistry lab.  The exhaust hoods delivered earlier are stored here
before installation. The two Gen Chem labs are now separated with the wall on the right
and the view outside, even with the external sun shades, is spectacular.

Return to Renovation Photo Gallery List