Bowers Renovation
July 2013

Previous Home Next

C15

July 18, 2013.
This is taken from the connection corridor to Bowers II.  The main "Animal Head" staircase is open on its
south side to the corridor.  The steel I-beams are being sand-blasted and then will be painted to keep the
entire area as open as possible.  (The animal heads were on the brick wall to the left.)

Return to Renovation Photo Gallery List