Bowers Renovation
January 2013
January 18, 2013.
The concrete for the Third Floor floor is brought from the concrete trucks
through the pink tube on the pump truck. The opening on the First Floor
is to the lobby area and the planetarium steel can be seen on the right.
Return to Renovation Photo Gallery
List