Bowers Renovation
December 2013

Previous Home Next

C11

December 19, 2013.
The Large Lecture Hall with two sets of vertically sliding blackboards.
The dropped ceiling is being installed and to the very right is the door that connects
to the hallway ramp outside the lecture hall and to the prep room behind the blackboard wall.

Return to Renovation Photo Gallery List