Bowers Renovation |
August 16, 2013.
Flooring has been put down some of the Second Floor labs. This is the
Microbiology lab
with an exhaust hood ready to be installed. Plumbing and gas lines are in
place
for each student bench. Light fixtures are installed, but remain wrapped.
Return to Renovation Photo Gallery List