Bowers Renovation
April 2013

Previous Home Previous

C21

April 8, 2013.
From the roof of Bowers II back to the roof over Bowers I.  Welding is being done on the
section above the main stairwell (the Animal Head staircase).  A lot of demolition will
be done this summer in this area as the new connection between the two wings is made.