April 8, 2013.
Third Floor General Chemistry Labs.  The wall separating the two labs has not gone up yet,
while they continue to work on plumbing and exhaust hood ductwork.  If you compare the 
ceiling height in this lab to the BIO 201-202 labs on the Second Floor you will easily see
that the ceiling here is much higher.  This is the benefit of being on the top floor that does
not have to have a level connection to the rest of the building.