Bowers Renovation
May  2012

Previous Home Next

C20

May 17, 2012.
Entire Museum Roof down.
The wood wall on the first floor closes off the hallway from the museum to the building.
The concrete wall to the left of that is the wall between the Fish Bowl and the Mailroom.
The windows to the right have been totally removed and covered with plastic.
Tricia Conklin's air conditioner is still there on the third floor.

Return to Renovation Photo Gallery List