Physical Plant
Grounds
Structural Maintenance
Customer Service Center

607-753-2100
Fax 607-753-5986

Heating Plant
607-753-2120
Fax 607-753-2931

Mail Services/Central Warehouse
607-753-2509
Fax 607-753-5949

Motor Pool
607-753-2489
Fax 607-753-5594

Transportation Center
607-753-2129
Fax 607-753-5594

Bookmark and Share

Physical Plant

The physical plant

The Physical Plant maintains and operates the physical facilities of SUNY Cortland in order to provide a clean, attractive, safe, healthy and productive environment for living, teaching, learning, playing and working.

Our goal is to provide these services to our customers in a manner consistent with SUNY Cortland′s culture of improvement.

We make a difference!

Facts about Facilities

The main campus encompasses 2 1/2 million square feet, with a replacement value of $340 million dollars, consisting of 41 structures linked by underground electrical, sanitary, storm, gas, steam and domestic water lines on 191 acres, including 45 acres of athletic fields all maintained by Physical Plant staff.

In addition, Physical Plant is responsible for 276,000 square feet of roads, 576,000 square feet of walks, steps and terraces, 35 acres of manicured lawn, more than 175 air conditioning/refrigeration units, 32 elevators, two Olympic-size swimming pools, a 2,400 seat ice arena and over 4,000 pieces of mechanical equipment, all of which are tracked by a preventative maintenance management system.

The Central Heating Plant, which houses six high-pressure steam boilers capable of producing 160 million BTUs per hour, operates 24 hours per day providing around-the-clock coverage and emergency service to the entire campus. Physical Plant also provides support services and supplies to satellite operations at Hoxie Gorge, Brauer Education Center in Selkirk, N.Y., and the 446-acre Outdoor Recreation Center at Raquette Lake.